6
for a period of twelve (12) months. Among
other requirements during the probation, the
licensee shall enroll in, attend the Special
Board Laws & Rules course.
Dusenbury, David
Air Dynamics, LLC
Apex, NC
License# 32576 H-3-I
Allegations the licensee failed to obtain a
permit prior to commencing work, failed to
perform a load calculation prior to equip-
ment selection.
David Dusenbury signed a Proposed Resolu-
tion Agreement 07/19/2022.
The Review Committee found that the alle-
gations were supported by the evidence and
recommended that the license, number
32576 H-3-I, and that of the firm shall be
placed on a supervised probation for a peri-
od of twelve (12) months. Among other
requirements during the probation, licensee
shall enroll in, attend and complete the Spe-
cial Board Laws & Rules course.
Farr, Michael A.
K.I.C.Z Maintenance
& Remodeling, Inc.
Grandy, NC
License# 23177 H-3-II
Allegations the licensee failed to perform a
load calculation for the HVAC installation on
this complaint, pulled a permit for a firm that
was not licensed, allowed the use of license
by unlicensed persons, and obtained a permit
and allowed his license number to appear on
a permit on a job where the licensee did not
hold the contract with the homeowner or
general contractor, the licensee did not su-
pervise, the installation was not performed
by the licensee or bona-fide employees of the
licensee and did not receive the contractual
payment for the job.
Resolution Conference held 06/28/2022.
The Review Committee found that the alle-
gations were supported by the evidence and
recommended that the license of Michael
Farr, number 23177 H-3-II, and that of the
firm shall be placed on supervised probation
for a period of thirty-six (36) months.
Among other requirements during the pro-
bation, the licensee shall enroll in, attend, and
complete the series of Special Contractor
Business Management courses
Gaskins, Warren O., III
Hatteras Island Air, Inc.
Avon, NC
License# 32971 H-3-I
Allegations the licensee failed to obtain per-
mit(s) prior to commencing work due to
oversite by the permitting employee, and
failed to obtain final inspection(s) within ten
(10) days of substantial completion of the
work.
Warren Gaskins signed a Proposed Resolu-
tion Agreement 06/15/2022.
The Review Committee found that the alle-
gations were supported by the evidence and
recommended that the license of Warren
“Tater” Gaskins, number 32971 H-3-I, and
that of the firm shall be placed on a unsuper-
vised probation for a period of twelve (12)
months. Among other requirements during
the probation, the licensee shall enroll in,
attend, and complete the Special Board Laws
& Rules course. Within thirty (60) days from
signing this agreement the licensee shall ob-
tain a final inspection of all open permits or
submit evidence of his efforts to obtain final
inspection for each job as outlined below:
The licensee shall submit a letter to each
homeowner, certified mail return receipt,
notifying the homeowner that the installation
performed is required by state law to be
inspected by the local inspection department
and that failure to have the installation in-
spected could lead to the electrical or gas
service being disconnected from the struc-
ture by the local code enforcement official.
The letter should ask that the homeowner
notify the licensee within 10 days of receipt
of the letter to schedule a date for inspec-
tion. Within 15 days of sending the original
letter, the licensee shall send a second letter,
certified mail return receipt, to those home-
owners who have failed to respond in the
timeframe prescribed above, notifying the
homeowner that the installation performed is
required by law to be inspected by the local
inspection department and that failure to
have the installation inspected could lead to
the electrical or gas service being disconnect-
ed from the structure. A copy of both let-
ters shall also be sent to the appropriate
local code enforcement official’s office and to
the Board’s office.
Hayes, Joseph E.
American Residential Services LLC,
d/b/a ARS
Raleigh, NC
License# 29147 PH-1&3-1
Allegations the licensee of the firm failed to
perform a proper load calculation, installed
an air conditioning system that was signifi-
cantly oversized, submitted incorrect load
calculation information to the homeowners,
failed to provide proper and adequate super-
vision, and violated the minimum standard of
the North Carolina State Mechanical Code.
Resolution Conference held 06/30/2022.
The Review Committee found that the alle-
gations were supported by the evidence and
recommended that the license of Joseph
Hayes, number 29147 PH-1&3-I, and that of
the firm shall be placed on supervised proba-
tion for a period of twenty-four (24) months.
Among other requirements during the pro-
bation, the licensee shall enroll in, attend, and
complete the series of Special Mechanical
Design courses and the Special Board Laws &
Rules course.
Kanupp, Lynn Lee
Kanupp Heating and Air
Connelly Springs, NC
License# 34186 H-3-I
Allegations the licensee failed to properly
permit the mechanical installation of (5) sin-
gle head Blue Ridge mini-splits units and vio-
lated GS 87-21 and the Board laws and rules
by contracting with an unlicensed general
contractor, Lynn Kanupp signed a Proposed
Resolution Agreement 06/15/2022.
The Review Committee found that the alle-
gations were supported by the evidence and
recommended that the license of Lynn
Kanupp, number 34186 H-3-I, and that of the
firm shall be placed on unsupervised proba-
tion for a period of twelve months. Among
other requirements during the probation, by
June 24th, 2022 the contractor shall return
to the homes located at 4515 Carswell Road,
and perform a thorough Manual J load calcu-
lation and a Manual S equipment sizing calcu-
lation, and the licensee shall enroll in, attend,
and complete the Special Board Laws & Rules
course.
Kirschbaum, Robert M.
Service Experts Heating
& Air Conditioning, LLC
Raleigh, NC
License# 33365 P-I, Sublicensee
Allegations the licensee failed to obtain per-
mit(s) prior to commencing work, failed to
request inspections within 10 days of sub-
stantial completion of work, failed to obtain
final inspections, failed to provide proper and
adequate supervision, and violated the mini-
mum standard of the North Carolina State
Plumbing Code.
Resolution Conference held 06/28/2022.
The Review Committee found that the alle-
gations were supported by the evidence and
recommended that the license of Robert
Kirschbaum, number 33365 P-I, and that of
the firm shall be placed on unsupervised pro-
bation for a period of twelve (12) months.
Among other requirements during the pro-
bation, the licensee shall enroll in, attend, and
complete the Special Board Laws & Rules
course.
Mitchell, Michael A.
Mitchell Heating & Cooling, Inc.
Rolesville, NC
License# 6374 H-3-I
Allegations the licensee failed to obtain per-
mit(s) prior to commencing work, failed to
request inspections within 10 days of sub-
stantial completion of work, failed to obtain
final inspections on the zoning system instal-
lation, and failed to provide adequate super-
vision.
Resolution Conference held 06/28/2022.