Items G. – J.: Provide the name, telephone and fax number (including area code) and E-mail address of the person
authorized to submit this NOI on behalf of the operator (e.g., Jane Smith, President of Smith Construction Company on
behalf of the operator, Smith Construction Company; John Doe, Public Works Director on behalf of the operator, City of
Townsville; etc.). This should be the same person as indicated in the certification in Part VI.
Part IV – Project/Site Location Information:
Items A. – E.: Enter the official or legal name and complete street address, including city, state and zip code of the project.
Do not provide a P.O. Box number as the street address. If it lacks a street address, describe the project site location (e.g.,
intersection of State Road 1 and Smith Street).
Item F.: Enter the county in which the project is located.
Item G.: Enter the latitude and longitude, in degrees-minutes-seconds format, of the approximate center of the project.
Item H.: Indicate whether the project is located on Indian Country Lands. If the project is located on Indian Lands you
may not use this generic permit. Instead, you must apply to the http://cfpub.epa.gov/npdes/stormwater/const.cfm (EPA) for
coverage.
Item I.: Enter the appropriate five or six letter code from the list below to indicate the
http://www.dep.state.fl.us/secretary/watman/default.htm in which your project is located:
NWFWMD = Northwest Florida Water Management District
SRWMD = Suwannee River Water Management District
SFWMD = South Florida Water Management District
SWFWMD = Southwest Florida Water Management District
SJRWMD = St. John’s River Water Management District
Items J. – M.: Enter the name, telephone and fax number (including area code) and E-mail address of the project contact
person. The project contact is the person who is thoroughly familiar with the project, the facts reported in this NOI and
who can be contacted by the Department if necessary.
Item N.: Enter additional E-mail correspondence as needed to receive permit related documentation. (Optional)
Part V – Project/Site Activity Information:
Item A.: Check the appropriate box to indicate whether the project involves large construction activity or small construction
activity. Check one box only.
“Large Construction Activity” means construction activity resulting in the disturbance of five (5) or more acres of total land
area. Large construction activity also includes the disturbance of less than five acres of total land area that is part of a
larger common plan of development or sale such as a subdivision that will ultimately disturb five acres or more.
“Small Construction Activity” means construction activity resulting in the disturbance of equal to or greater than one (1)
acre and less than five (5) acres of total land area. Small construction activity also includes the disturbance of less than one
acre of total land area that is part of a larger common plan of development or sale that will ultimately disturb equal to or
greater than one acre and less than five acres.
Item B.: Provide the approximate total area of land disturbance, in acres, that the project will involve from commencement
of construction through completion.
Items C. - G.: Indicate the location where the Stormwater Pollution Prevention Plan (SWPPP) can be viewed. Provide the
address where the SWPPP can be viewed if other than as provided in Parts II or III of the NOI. Note that to be eligible for
coverage under the generic permit, the SWPPP must have been prepared prior to filing this NOI.
Item H.: Enter the estimated construction start and completion dates in the MM/DD/YY format.
Page 5 of 6
DEP Form 62-621.300(4)(b)
Effective Date: 02/2015